Exterior installations fail at the details, not the stone. Use this checklist before, during and after a facade install.
Before you order
- Confirm the substrate: cement board, render or masonry — flat, cured and dry.
- Check the exposure: sheltered, driving rain, coastal salt or freeze-thaw.
- Decide the drainage strategy: sealed and bonded, or drained and ventilated.
- Measure the facade and add 10–15% for cuts and shade matching.
- Order all sheets for one elevation in the same batch where possible.
Before you install
- Let the substrate cure fully; damp boards trap moisture behind the sheet.
- Check flatness with a 2 m straight edge — correct hollows and high spots.
- Prime according to the adhesive specification.
- Dry-lay several boxes together and plan the shade sequence.
- Set out expansion and movement joints before fixing the first sheet.
During installation
- Use exterior-grade adhesive at full bed coverage.
- Press each sheet from the centre outward and roll the full face.
- Keep the stone face at least 150 mm above ground and splash level.
- Seal perimeter, movement and penetration joints with neutral-cure silicone.
- Do not install in rain, frost or temperatures outside the adhesive range.
After installation
- Tap-check every sheet for hollow spots after curing.
- Photograph the finished elevation and any concealed details.
- Leave a maintenance note: annual seal inspection, pH-neutral cleaning.
- Keep spare sheets from the same batch for future repairs.
Common failures to avoid
Trapped moisture — cladding over a damp substrate or sealing every joint on a wet wall. Thermal movement — no gaps at floor level or between panels. Poor bond — spot-fixing instead of a full bed. Wrong silicone — an acid-cure product that stains limestone.