00 / ARCHITECTURAL CLADDING SYSTEMS

Four Engineered Assemblies.
One 3.0 mm Monolithic Core.

A stone sheet alone is not a building envelope. Specify complete assemblies pairing our Class A2 3.0 mm modified-clay slabs with our two-component flexible adhesive (H01 emulsion + H02 mineral powder, 3–4.5 kg/m²), 45° bevel-mitered corners, and verified substrate details across walls, facades, curved columns, and wet zones.

04 VERTICAL & CURVED SYSTEMS
3–4.5 KG/M² 2-COMP. H01+H02
3,000H WEATHERING · -30°C TESTED
Class A2 NON-COMBUSTIBLE · TVOC 0.8

01 / INTERACTIVE SYSTEM ASSEMBLIES

Select Your Building Envelope

Click any system below or inspect numbered cutaway pins (01–05) to read layer specifications.

SYS 01 · DRY INTERIOR · VERTICAL WALLS · ZERO DEMOLITION
3D architectural L-corner cutaway of SOFTSTONE Interior Wall System showing drywall substrate, consolidating primer, combed flexible adhesive, 45-degree bevel-mitered travertine corner, and metal reveal strip 01 SUBSTRATE 02 CONSOLIDATING PRIMER 03 H01+H02 · 3–4.5 KG/M² 04 45° BEVEL-MITER 05 GROUT / METAL REVEAL
ACTIVE NODE INSPECTION
04 / 45° Bevel-Mitered Outside Corner + Flexible Grout

Adjacent 3.0 mm stone edges chamfered at 45° and sealed with a crisp 1.5–2.0 mm color-matched flexible mineral grout seam.

BUILD-UP ~4.5 mm Total
ADHESIVE RATE 3–4.5 kg/m²
JOINT WIDTH 0–1 / 2–3 / 3–6 mm
CORNER / FORM 45° Bevel-Miter

02 / ENGINEERING COMPARISON MATRIX

Four Systems, Side by Side

Compare adhesive chemistry, joint allowances, cold-forming limits, and waterproofing requirements at a glance. Click any system header to load its 3D cutaway above.

ENGINEERING PARAMETER
Application Scope Dry vertical interior walls, lobbies & feature wallsExterior building facades & perimeter wallsCurved vertical walls & columns (No overhead ceilings)Walk-in showers, bathrooms & thermal spa walls
Two-Component Adhesive & Rate Two-Component H01 Emulsion + H02 Powder · 3–4.5 kg/m²Two-Component H01 Emulsion + H02 Powder · 3–4.5 kg/m² (IMO Non-DG)Two-Component H01 Emulsion + H02 Powder · 3–4.5 kg/m²Two-Component H01 Emulsion + H02 Powder · 3–4.5 kg/m² over membrane
Notch Trowel & Bond Line 4–6 mm V/U-Notch · ~1.5 mm compressed4–6 mm V/U-Notch · ~1.5 mm compressed4–6 mm V/U-Notch · ~1.5 mm compressed4–6 mm V/U-Notch · ~1.5 mm compressed
Standard Slab Formats 1200×3000 / 1200×2400 / 600×1200 mm600×1200 / 1200×2400 mm modular1200×2400 / 600×1200 mm vertical grain1200×2400 / 600×1200 mm
Joint & Expansion Strategy 0–1 mm tight, 2–3 mm grout, or 3–6 mm metal reveal6–10 mm flexible grout + PE rod silicone expansion joints0–1 mm tight seam or 2–3 mm color-matched grout2–3 mm anti-mold grout + 3 mm sanitary silicone corners
Corner & Edge Termination 45° bevel-miter corner + color-matched grout45° bevel-miter + frameless direct-bond edge (no brackets)Continuous radius wrap · 45° miter at flat returns45° bevel-miter outside · sanitary silicone inside corners
Curving & Forming Rule Flat / minor wall undulationsGentle architectural curves (ambient cold-press)Ambient cold-press R ≥ 150 mm (no heat gun); 3D fluted vertical-rib axis onlyAmbient cold-press over tanked curved shower walls
Waterproofing & Sealer Unsealed raw mineral ex-factory · Sealer optional on requestAlkali primer below · Unsealed mineral face (sealer optional)Interface primer below · Unsealed raw mineral ex-factory2-coat liquid membrane + corner mesh below · Sealer optional only

02B / LAB-VERIFIED PERFORMANCE · CNAS / ILAC-MRA (JC/T 2219-2014)

Accredited Material & Export Compliance Data

ADHESIVE EXPORT STATUS (H01 + H02) IMO IMDG Non-Hazardous Sea Freight

Closed-cup flash point >70°C (non-flammable) · Not classified as dangerous goods for ocean shipping.

FIRE RATING Class A2 Non-Combustible · JC/T 2219-2014

Inorganic modified-clay core certified A2 non-combustible for commercial & facade envelopes.

ACCELERATED WEATHERING 3,000 hrs Grade 1 Chalking · Grade 1 Color

100% inorganic mineral pigments & mineral-oxide inks resist UV bond breakdown unlike organic dyes — achieving Grade 1 colorfastness and zero chalking, blistering, or cracking across 3,000h aging.

FREEZE-THAW CYCLING -30°C × 30 30 Cycles · Zero Surface Defect

Passed 30 freeze-thaw cycles down to -30°C without cracking, chalking, or delamination.

TVOC & HEAVY METALS 0.8 g/m² Limit <10 g/m² · Pb & Cd Not Detected

Ultra-low TVOC (<8% of standard limit); soluble lead & cadmium below 0.1 mg/m² detection.

RADIOACTIVITY INDEX IRa 0.1 / Ir 0.1 Class A Limits ≤1.0 / ≤1.3

10× below Class A residential radiation limits — safe for enclosed bedrooms, spas & lobbies.

WATER ABSORPTION 7.5% Limit <15% · Zero Swelling

Breathable inorganic mineral matrix with zero blistering, cracking, or delamination.

DIMENSIONAL & THERMAL ±0.3 mm / 0.12% Length ±0.3 · Width ±0.2 · Heat 0.12%

High-precision factory cut tolerance (limit ±1 mm) and 0.12% thermal dimensional shift (≤0.5%).

SURFACE & CHEMICAL Grade 1 Stain Acid / Alkali Resistant · 0.1 g/750r

Top Grade 1 stain resistance on textured stone, 0.29 mm indentation, and zero acid/alkali degradation.

03 / STANDARD ARCHITECTURAL DETAILS · SCALE 1:2 / 1:5

Construction Node Plates & Substrate Matrix

True cross-section drafting plates prepared for architects, specifiers, and site contractors. Click any plate to inspect enlarged scale geometry.

45° MITER 3.0 mm ~1.5 mm 45° BEVEL-MITER 1.5–2.0 mm color-matched flexible grout seal 3.0 MM STONE Monolithic mineral core + fiberglass mesh back 2-COMP. BOND H01+H02 · 3–4.5 kg/m² Over primed substrate EXISTING SUBSTRATE Drywall / Render / Tile DWG NO. SOFTSTONE-SYS-D01 · PLAN SECTION 45° BEVEL-MITERED OUTSIDE CORNER · ZERO L-TRIM REQUIRED SCALE 1:2
DETAIL D-01 · SYS 01 / 02

45° Bevel-Mitered Outside Corner

Factory or site-chamfered 45° stone arris bonded directly over primed corner with 1.5–2.0 mm color-matched flexible grout corner seal.

RENDER 10–12 MM EXP. JOINT NEUTRAL SILICONE Concave bead (-2 mm) Over PE foam backer rod FRAMELESS DIRECT EDGE Direct perimeter weather-seal No mechanical starter brackets 2-COMP. H01+H02 (3–4.5 kg/m²) + ALKALI PRIMER FIELD GROUT: 6–10 MM FLEXIBLE Expansion joints @ slabs / 6–9 m grid DWG NO. SOFTSTONE-SYS-D02 · HORIZONTAL SECTION EXTERIOR MOVEMENT JOINT + FRAMELESS DIRECT-BOND TERMINATION SCALE 1:2
DETAIL D-02 · SYS 02 EXTERIOR

Expansion Joint & Frameless Edge

Closed-cell PE foam backer rod with neutral silicone movement joint alongside 6–10 mm weather grout and bracket-free perimeter termination.

A / COLD-FORMED COLUMN AMBIENT PRESS · NO HEAT GUN R ≥ 150 MM 2-Comp. H01+H02: 3–4.5 kg/m² 3.0 mm stone cold-pressed on site B / 3D FLUTED RIB RULE UNIAXIAL VERTICAL AXIS ONLY ✓ APPROVED: PARALLEL TO RIBS Flutes stay vertical (Z-axis) ✕ PROHIBITED: CROSS-RIB BEND STRESS FRACTURE Never bend across fluted ribs DWG NO. SOFTSTONE-SYS-D03 · CURVED PLAN & RIB AXIS VERTICAL WALLS & COLUMNS ONLY · NO OVERHEAD CEILINGS SCALE 1:5
DETAIL D-03 · SYS 03 CURVED

Cold-Formed Radius & Uniaxial Flutes

Ambient cold-press curving around R ≥ 150 mm columns without heat guns; 3D deep-relief fluted panels strictly bend parallel to vertical ribs.

SLOPED SCREED (≥ 1.5% FALL → DRAIN) 3.0 MM NATURAL MINERAL STONE Unsealed ex-factory · Sealer optional only 2–3 MM WATERPROOF GROUT Anti-mold + 2-Comp. H01+H02 (3–4.5 kg/m²) 2-COAT LIQUID MEMBRANE + MESH Elastomeric barrier w/ fiberglass corner band 3 MM SANITARY SILICONE FILLET CEMENT BACKER BOARD DWG NO. SOFTSTONE-SYS-D04 · VERTICAL SECTION WET-ZONE WALL-TO-FLOOR WATERPROOFING & MOVEMENT FILLET SCALE 1:2
DETAIL D-04 · SYS 04 WET-ZONE

Wall-to-Floor Waterproof Junction

Primary waterproofing handled by 2-coat elastomeric membrane & corner reinforcing mesh beneath unsealed 3.0 mm stone and silicone fillet.

03B / EXISTING SUBSTRATE PREPARATION MATRIX

Site Readiness Rules for Renovation & New Build

Existing Ceramic / Porcelain Tile PRIME & BOND

Thoroughly degrease and wash glaze clean; repair any hollow tiles; roll dedicated tile bonding / quartz interface primer before thin-bed adhesive.

APPLIES TO: SYS 01 · SYS 02 · SYS 04
Painted Drywall / Gypsum Plaster SCARIFY & PRIME

Scrape away all flaking, chalking, or glossy latex paint (never bond over loose paint film); abrade/scarify sound wall and apply penetrating consolidating primer.

APPLIES TO: SYS 01 · SYS 03
Exterior Cement Render / Stucco TEST & ALKALI PRIME

Verify bond soundness via pull-off check; patch hollow stucco and level ≥3 mm undulations; apply alkali-resistant consolidating primer before two-component H01 + H02 adhesive.

APPLIES TO: SYS 02
Raw Fair-Faced Cast Concrete CLEAN & PRIME

Remove formwork release oils, dust, and surface laitance; dampen or apply interface primer depending on suction rate before notched adhesive.

APPLIES TO: SYS 01 · SYS 02 · SYS 03
Cement Backer Board (Wet Areas) WATERPROOF TANK

Tape board joints, apply primer, and install continuous 2-coat liquid flexible waterproofing membrane with fiberglass reinforcing tape at all inside corners.

APPLIES TO: SYS 04
Curved Plywood / Arch Formwork SEAL & PRIME

Verify rigid multi-ply curved framing without flex bounce; seal wood fibers with moisture-blocking interface primer prior to two-component H01 + H02 adhesive.

APPLIES TO: SYS 03 (Dry Interior)

04 / SPECIFICATION & MATERIAL TAKEOFF

Send Us Your Wall Elevation & Substrate Photo.

Our specification desk responds within 2 hours with exact slab yield, scene-matched adhesive tonnage (calculated at 3–4.5 kg/m²), primer spec, and corner detailing guidance.